Save time, empower your teams and effectively upgrade your processes with access to this practical Control Code Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Control Code related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

 

store.theartofservice.com/Control-Code-toolkit-best-practice-templates-step-by-step-work-plans-and-maturity-diagnostics/

 

The Toolkit contains the following practical and powerful enablers with new and updated Control Code specific requirements:

STEP 1: Get your bearings

Start with…

  • The latest quick edition of the Control Code Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals…

STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Control Code improvements can be made.

Examples; 10 of the standard requirements:

  1. Are process variation components displayed/communicated using suitable charts, graphs, plots?

  2. Political -is anyone trying to undermine this project?

  3. Does the Control Code performance meet the customer’s requirements?

  4. What is our formula for success in Control Code ?

  5. What are internal and external Control Code relations?

  6. How do the Control Code results compare with the performance of your competitors and other organizations with similar offerings?

  7. What are the stakeholder objectives to be achieved with Control Code?

  8. What would have to be true for the option on the table to be the best possible choice?

  9. How do our controls stack up?

  10. Do we say no to customers for no reason?

Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Control Code book in PDF containing requirements, which criteria correspond to the criteria in…

Your Control Code self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Control Code Self-Assessment and Scorecard you will develop a clear picture of which Control Code areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Control Code Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Control Code projects with the 62 implementation resources:

  • 62 step-by-step Control Code Project Management Form Templates covering over 6000 Control Code project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Activity Duration Estimates: Do you think many other organizations could apply this methodology, or does each organization need to create its own methodology?
  2. Human Resource Management Plan: Is the current culture aligned with the vision, mission, and values of the department?
  3. Activity Duration Estimates: Does a process exist to formally recognize new Control Code projects?
  4. Human Resource Management Plan: Is there a set of procedures to capture, analyze and act on quality metrics?
  5. Procurement Management Plan: Are meeting minutes captured and sent out after meetings?
  6. Project or Phase Close-Out: In addition to assessing whether the Control Code project was successful, it is equally critical to analyze why it was or was not fully successful. Are you including this?
  7. Activity Duration Estimates: Are procedures defined for calculating cost estimates?
  8. Human Resource Management Plan: Are internal Control Code project status meetings held at reasonable intervals?
  9. Project Management Plan: Are there any scope changes proposed for a previously authorized Control Code project?
  10. Stakeholder Analysis Matrix: Does the stakeholder want to be involved or merely need to be informed about the Control Code project and its process?

 
Step-by-step and complete Control Code Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Control Code project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix

2.0 Planning Process Group:

  • 2.1 Control Code project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Control Code project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Control Code project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan

3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log

4.0 Monitoring and Controlling Process Group:

  • 4.1 Control Code project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance

5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Control Code project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Control Code project with this in-depth Control Code Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Control Code projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Control Code and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, ‘What are we really trying to accomplish here? And is there a different way to look at it?’

This Toolkit empowers people to do just that – whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc… – they are the people who rule the future. They are the person who asks the right questions to make Control Code investments work better.

This Control Code All-Inclusive Toolkit enables You to be that person:

 

store.theartofservice.com/Control-Code-toolkit-best-practice-templates-step-by-step-work-plans-and-maturity-diagnostics/

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.

Categories: Documents