Save time, empower your teams and effectively upgrade your processes with access to this practical Manufacturing Network Design Toolkit and guide. Address common challenges with best-practice templates, step-by-step work plans and maturity diagnostics for any Manufacturing Network Design related project.

Download the Toolkit and in Three Steps you will be guided from idea to implementation results.

 

store.theartofservice.com/Manufacturing-Network-Design-toolkit-best-practice-templates-step-by-step-work-plans-and-maturity-diagnostics/

 

The Toolkit contains the following practical and powerful enablers with new and updated Manufacturing Network Design specific requirements:

STEP 1: Get your bearings

Start with…

  • The latest quick edition of the Manufacturing Network Design Self Assessment book in PDF containing 49 requirements to perform a quickscan, get an overview and share with stakeholders.

Organized in a data driven improvement cycle RDMAICS (Recognize, Define, Measure, Analyze, Improve, Control and Sustain), check the…

  • Example pre-filled Self-Assessment Excel Dashboard to get familiar with results generation

Then find your goals…

STEP 2: Set concrete goals, tasks, dates and numbers you can track

Featuring 667 new and updated case-based questions, organized into seven core areas of process design, this Self-Assessment will help you identify areas in which Manufacturing Network Design improvements can be made.

Examples; 10 of the 667 standard requirements:

  1. Have the problem and goal statements been updated to reflect the additional knowledge gained from the analyze phase?

  2. How will you measure the results?

  3. Who are you going to put out of business, and why?

  4. Why should we adopt a Manufacturing Network Design framework?

  5. If we do not follow, then how to lead?

  6. Is the scope of Manufacturing Network Design defined?

  7. Does Manufacturing Network Design create potential expectations in other areas that need to be recognized and considered?

  8. At what point will vulnerability assessments be performed once Manufacturing Network Design is put into production (e.g., ongoing Risk Management after implementation)?

  9. Does the goal represent a desired result that can be measured?

  10. What critical content must be communicated; who, what, when, where, and how?

Complete the self assessment, on your own or with a team in a workshop setting. Use the workbook together with the self assessment requirements spreadsheet:

  • The workbook is the latest in-depth complete edition of the Manufacturing Network Design book in PDF containing 667 requirements, which criteria correspond to the criteria in…

Your Manufacturing Network Design self-assessment dashboard which gives you your dynamically prioritized projects-ready tool and shows your organization exactly what to do next:

  • The Self-Assessment Excel Dashboard; with the Manufacturing Network Design Self-Assessment and Scorecard you will develop a clear picture of which Manufacturing Network Design areas need attention, which requirements you should focus on and who will be responsible for them:

    • Shows your organization instant insight in areas for improvement: Auto generates reports, radar chart for maturity assessment, insights per process and participant and bespoke, ready to use, RACI Matrix
    • Gives you a professional Dashboard to guide and perform a thorough Manufacturing Network Design Self-Assessment
    • Is secure: Ensures offline data protection of your Self-Assessment results
    • Dynamically prioritized projects-ready RACI Matrix shows your organization exactly what to do next:

 

STEP 3: Implement, Track, follow up and revise strategy

The outcomes of STEP 2, the self assessment, are the inputs for STEP 3; Start and manage Manufacturing Network Design projects with the 62 implementation resources:

  • 62 step-by-step Manufacturing Network Design Project Management Form Templates covering over 6000 Manufacturing Network Design project requirements and success criteria:

Examples; 10 of the check box criteria:

  1. Responsibility Assignment Matrix: Do others have the time to dedicate to your Manufacturing Network Design project?
  2. Stakeholder Analysis Matrix: Participatory Approach: How will key stakeholders participate in the Manufacturing Network Design project?
  3. Lessons Learned: How effective was the acceptance management process?
  4. Procurement Audit: Did the conditions included in the contract protect the risk of non-performance by the supplier and were there no conflicting provisions?
  5. Team Member Status Report: The problem with Reward & Recognition Programs is that the truly deserving people all too often get left out. How can you make it practical?
  6. Requirements Traceability Matrix: Is there a requirements traceability process in place?
  7. Quality Audit: Are all employees including salespersons made aware that they must report all complaints received from any source for inclusion in the complaint handling system?
  8. Scope Management Plan: Are the proposed Manufacturing Network Design project purposes different than the previously authorized Manufacturing Network Design project?
  9. Change Request: Will the change use memory to the extent that other functions will be not have sufficient memory to operate effectively?
  10. Procurement Audit: Is a cost/benefit analysis, a cost/effectiveness or a financial analysis considering life-cycle costs performed and is the funding of the procurement guaranteed?

 
Step-by-step and complete Manufacturing Network Design Project Management Forms and Templates including check box criteria and templates.

1.0 Initiating Process Group:

  • 1.1 Manufacturing Network Design project Charter
  • 1.2 Stakeholder Register
  • 1.3 Stakeholder Analysis Matrix

2.0 Planning Process Group:

  • 2.1 Manufacturing Network Design project Management Plan
  • 2.2 Scope Management Plan
  • 2.3 Requirements Management Plan
  • 2.4 Requirements Documentation
  • 2.5 Requirements Traceability Matrix
  • 2.6 Manufacturing Network Design project Scope Statement
  • 2.7 Assumption and Constraint Log
  • 2.8 Work Breakdown Structure
  • 2.9 WBS Dictionary
  • 2.10 Schedule Management Plan
  • 2.11 Activity List
  • 2.12 Activity Attributes
  • 2.13 Milestone List
  • 2.14 Network Diagram
  • 2.15 Activity Resource Requirements
  • 2.16 Resource Breakdown Structure
  • 2.17 Activity Duration Estimates
  • 2.18 Duration Estimating Worksheet
  • 2.19 Manufacturing Network Design project Schedule
  • 2.20 Cost Management Plan
  • 2.21 Activity Cost Estimates
  • 2.22 Cost Estimating Worksheet
  • 2.23 Cost Baseline
  • 2.24 Quality Management Plan
  • 2.25 Quality Metrics
  • 2.26 Process Improvement Plan
  • 2.27 Responsibility Assignment Matrix
  • 2.28 Roles and Responsibilities
  • 2.29 Human Resource Management Plan
  • 2.30 Communications Management Plan
  • 2.31 Risk Management Plan
  • 2.32 Risk Register
  • 2.33 Probability and Impact Assessment
  • 2.34 Probability and Impact Matrix
  • 2.35 Risk Data Sheet
  • 2.36 Procurement Management Plan
  • 2.37 Source Selection Criteria
  • 2.38 Stakeholder Management Plan
  • 2.39 Change Management Plan

3.0 Executing Process Group:

  • 3.1 Team Member Status Report
  • 3.2 Change Request
  • 3.3 Change Log
  • 3.4 Decision Log
  • 3.5 Quality Audit
  • 3.6 Team Directory
  • 3.7 Team Operating Agreement
  • 3.8 Team Performance Assessment
  • 3.9 Team Member Performance Assessment
  • 3.10 Issue Log

4.0 Monitoring and Controlling Process Group:

  • 4.1 Manufacturing Network Design project Performance Report
  • 4.2 Variance Analysis
  • 4.3 Earned Value Status
  • 4.4 Risk Audit
  • 4.5 Contractor Status Report
  • 4.6 Formal Acceptance

5.0 Closing Process Group:

  • 5.1 Procurement Audit
  • 5.2 Contract Close-Out
  • 5.3 Manufacturing Network Design project or Phase Close-Out
  • 5.4 Lessons Learned

 

Results

With this Three Step process you will have all the tools you need for any Manufacturing Network Design project with this in-depth Manufacturing Network Design Toolkit.

In using the Toolkit you will be better able to:

  • Diagnose Manufacturing Network Design projects, initiatives, organizations, businesses and processes using accepted diagnostic standards and practices
  • Implement evidence-based best practice strategies aligned with overall goals
  • Integrate recent advances in Manufacturing Network Design and put process design strategies into practice according to best practice guidelines

Defining, designing, creating, and implementing a process to solve a business challenge or meet a business objective is the most valuable role; In EVERY company, organization and department.

Unless you are talking a one-time, single-use project within a business, there should be a process. Whether that process is managed and implemented by humans, AI, or a combination of the two, it needs to be designed by someone with a complex enough perspective to ask the right questions. Someone capable of asking the right questions and step back and say, ‘What are we really trying to accomplish here? And is there a different way to look at it?’

This Toolkit empowers people to do just that – whether their title is entrepreneur, manager, consultant, (Vice-)President, CxO etc… – they are the people who rule the future. They are the person who asks the right questions to make Manufacturing Network Design investments work better.

This Manufacturing Network Design All-Inclusive Toolkit enables You to be that person:

 

store.theartofservice.com/Manufacturing-Network-Design-toolkit-best-practice-templates-step-by-step-work-plans-and-maturity-diagnostics/

 

Includes lifetime updates

Every self assessment comes with Lifetime Updates and Lifetime Free Updated Books. Lifetime Updates is an industry-first feature which allows you to receive verified self assessment updates, ensuring you always have the most accurate information at your fingertips.