BREEAM - Building Research Establishment Environmental Assessment Method
Evidence request list. 47 controls, 47 carrying auditor artefact guidance. Generated from the compliance knowledge graph on 11 September 2026. Published by The Art of Service.
Energy
Reduce regulated energy use and CO2 emissions through fabric efficiency and building services design with dynamic simulation modelling.
- DSM energy model
- EPC
- Carbon emission rate calculation
- Steady state model used
- No comparison to notional building
Install sub metering of energy end uses and major plant items with provision for ongoing energy management.
- Sub metering strategy
- Meter schedule
- BMS configuration
- No sub metering at major plant level
- BMS does not record consumption
Consider passive design analysis and low or zero carbon technology feasibility study at concept design.
- Passive design report
- LZC feasibility study
- Selected technology specification
- No passive design study
- LZC study post tender
Building energy demand and associated carbon emissions are minimized through efficient design.
- energy model
- carbon assessment
- reduction strategy
- commissioning report
- weak modeling
- no commissioning
- stale targets
Sub-metering systems enable monitoring and management of energy consumption.
- sub-meter inventory
- monitoring dashboard
- data logging procedure
- review log
- incomplete sub-metering
- no monitoring
- stale data
Passive and active low carbon design strategies reduce operational energy use.
- low carbon strategy
- passive design analysis
- feasibility report
- review record
- weak strategy
- no feasibility study
- missing review
Health and Wellbeing
Provide adequate daylight, view out, internal and external lighting levels, and glare control for occupant visual comfort.
- Daylight factor calculations
- Lighting design report
- Glare assessment
- No daylight modelling
- Lighting design ignores task variation
Design ventilation, manage VOC emissions from materials, and provide post construction air quality testing.
- IAQ plan
- Material VOC declarations
- Post completion air test report
- No VOC limits in specifications
- No post completion testing
Design building services to deliver adequate thermal comfort levels assessed using dynamic thermal modelling.
- Thermal modelling report
- Comfort criteria
- Local control documentation
- No dynamic modelling
- Comfort assessed for default occupancy only
Achieve acoustic performance criteria for sound insulation, indoor ambient noise, and reverberation appropriate to building use.
- Acoustic design report
- Pre completion test results
- No acoustic consultant engaged
- Tests not done in worst case rooms
Adequate daylighting and glare control are provided to ensure visual comfort for occupants.
- daylight analysis
- glare assessment
- lighting design
- measurement record
- weak analysis
- no glare check
- stale measurements
Indoor air quality is maintained through ventilation, low-emission materials, and pollutant control.
- IAQ assessment
- VOC test results
- ventilation design
- monitoring log
- no VOC testing
- weak ventilation
- stale monitoring
Thermal comfort levels are achieved through effective heating, cooling, and ventilation design.
- thermal modeling
- comfort survey
- HVAC design
- commissioning record
- no surveys
- weak modeling
- poor commissioning
Acoustic design ensures appropriate sound insulation and ambient noise levels.
- acoustic design
- test results
- occupant survey
- review record
- no testing
- weak design
- no occupant input
The building is designed to be accessible and inclusive for all users.
- accessibility assessment
- compliance certificate
- review record
- user consultation
- weak assessment
- no consultation
- stale review
Innovation
Achieve innovation credits via exemplary level criteria, approved innovations, or BRE approved innovative measures.
- Innovation application
- BRE approval letter
- Exemplary level evidence
- No innovation pursued
- Application not submitted in time
Land Use and Ecology
Locate the development on previously developed land or contaminated land with appropriate remediation.
- Land contamination report
- Remediation strategy
- Site history evidence
- Greenfield site without justification
- No contamination assessment
Engage a Suitably Qualified Ecologist to enhance site ecology through planting, habitat creation, and biodiversity action plan.
- SQE report
- Biodiversity action plan
- Landscape design with ecology
- No SQE engaged
- Plan ignored at construction
Land Use, Ecology, and Pollution
Development is steered towards previously developed brownfield land to protect greenfield sites.
- site assessment
- contamination report
- ecological survey
- approval record
- weak assessment
- no ecological survey
- missing approvals
The ecological value of the site is maintained and enhanced through biodiversity management.
- ecology survey
- biodiversity action plan
- monitoring schedule
- review record
- weak survey
- no action plan
- stale monitoring
Refrigerant selection minimizes global warming and ozone depletion potential.
- refrigerant inventory
- GWP assessment
- leak detection log
- disposal procedure
- high-GWP refrigerants
- weak leak detection
- no disposal record
Heating system NOx emissions are minimized to reduce local air pollution.
- NOx emissions data
- equipment register
- compliance certificate
- monitoring log
- non-compliant equipment
- weak monitoring
- no certificate
Sustainable drainage systems manage surface water run-off and reduce flood risk.
- SuDS design
- flood risk assessment
- drainage plan
- monitoring record
- weak SuDS
- no flood assessment
- stale monitoring
Management
Establish a project brief through stakeholder consultation and sustainability workshops that define sustainability targets and BREEAM aspirations.
- Project brief
- Stakeholder consultation report
- Sustainability champion appointment letter
- No documented consultation
- Targets set after design freeze
Conduct life cycle costing and service life planning at strategic and detail design stages to inform asset decisions.
- LCC analysis report
- Service life plan
- Maintenance strategy
- LCC done only on capital cost
- Service life not modelled
Operate the construction site under a Considerate Constructors scheme or equivalent with environmental management and community engagement.
- CCS registration
- Site environmental plan
- Community liaison records
- No environmental site plan
- No community engagement
Commission building services with seasonal commissioning, and provide handover information including building user guide.
- Commissioning plan
- Test results
- Building user guide
- Aftercare contract
- No seasonal commissioning
- User guide not provided
Sustainable development principles are integrated into project brief and design.
- Privacy program charter with executive sponsorship
- Privacy policy with version control and review cadence
- Privacy risk assessment and DPIA register
- Privacy incident log with root cause analysis
- Privacy notice not updated for new processing activities
- DSAR responses exceeding statutory deadlines
- Vendor inventory incomplete or stale
- Retention schedule not applied operationally
Whole life costing and service life planning are used to improve design and maintenance.
- Privacy program charter with executive sponsorship
- Privacy policy with version control and review cadence
- Privacy risk assessment and DPIA register
- Privacy incident log with root cause analysis
- Privacy notice not updated for new processing activities
- DSAR responses exceeding statutory deadlines
- Vendor inventory incomplete or stale
- Retention schedule not applied operationally
Construction site management follows best practice sustainability standards.
- Privacy program charter with executive sponsorship
- Privacy policy with version control and review cadence
- Privacy risk assessment and DPIA register
- Privacy incident log with root cause analysis
- Privacy notice not updated for new processing activities
- DSAR responses exceeding statutory deadlines
- Vendor inventory incomplete or stale
- Retention schedule not applied operationally
Building systems are properly commissioned, tested, and handed over to the end user.
- Privacy program charter with executive sponsorship
- Privacy policy with version control and review cadence
- Privacy risk assessment and DPIA register
- Privacy incident log with root cause analysis
- Privacy notice not updated for new processing activities
- DSAR responses exceeding statutory deadlines
- Vendor inventory incomplete or stale
- Retention schedule not applied operationally
Post-occupancy evaluation and aftercare support ensure building performance in use.
- Privacy program charter with executive sponsorship
- Privacy policy with version control and review cadence
- Privacy risk assessment and DPIA register
- Privacy incident log with root cause analysis
- Privacy notice not updated for new processing activities
- DSAR responses exceeding statutory deadlines
- Vendor inventory incomplete or stale
- Retention schedule not applied operationally
Materials
Use materials with lower environmental impact assessed via the BREEAM Mat 01 calculator or third party EPDs.
- Mat 01 calculator
- EPDs for major elements
- Material schedule
- EPDs unavailable for key elements
- Calculator not completed
Source materials from suppliers with recognised responsible sourcing certification such as FSC, PEFC, BES 6001, or equivalent.
- Certificates from suppliers
- Chain of custody records
- Material sourcing tracker
- No certificates for steel
- Timber not FSC or PEFC
Design protection against vehicle, vandalism, and weather damage to vulnerable areas to extend material service life.
- Protection design drawings
- Bollard specifications
- Corner protection details
- No protection at loading areas
- No design rationale
Materials and Waste
Construction materials are selected based on environmental life cycle assessment.
- LCA report
- materials inventory
- embodied carbon assessment
- review record
- weak LCA
- no embodied carbon view
- stale assessment
Materials are sourced from responsible and sustainable supply chains.
- responsible sourcing certificate
- supplier register
- procurement policy
- review record
- weak sourcing
- stale certificates
- no review
Construction waste is minimized and diverted from landfill through reuse and recycling.
- waste management plan
- waste audit
- diversion rate report
- disposal record
- weak plan
- no audit
- low diversion rates
Use of recycled and secondary aggregates reduces demand for virgin materials.
- recycled content register
- procurement records
- Certification
- review log
- low recycled content
- weak certification
- no review
Pollution
Specify refrigerants with low Global Warming Potential and install leak detection systems on refrigerant containing plant.
- Refrigerant schedule with GWP values
- Leak detection specification
- Refrigerant GWP above threshold
- No leak detection
Locate the building outside flood zones where possible and provide sustainable drainage to control surface water run off.
- Flood risk assessment
- SuDS design
- Drainage strategy
- No FRA done
- SuDS treated as last resort
Transport
Conduct a transport assessment and develop a travel plan promoting sustainable transport modes for occupants.
- Transport assessment
- Travel plan
- Cycle storage design
- No baseline travel survey
- Cycle storage undersized
Provide compliant cyclist facilities including covered storage, showers, lockers, and changing facilities.
- Facility specifications
- As built drawings
- Storage capacity calculation
- No showers provided
- Storage not secure
Waste
Implement a site waste management plan with targets for diversion from landfill and segregation of waste streams.
- SWMP
- Waste transfer notes
- Audit of waste streams
- SWMP not updated monthly
- Mixed skip dominant
Provide dedicated space for segregation and storage of operational recyclables and waste with adequate sizing for the building use.
- Waste storage area drawings
- Volume calculations
- Operational waste plan
- Storage undersized
- No segregation streams
Water
Specify sanitaryware and appliances to reduce potable water demand using a BREEAM water calculator.
- Water calculator output
- Sanitaryware specifications
- Flow rate test
- Calculator not completed
- Specifications changed at procurement
Install pulsed output water meters on incoming supply and major water consuming areas connected to the BMS.
- Meter schedule
- BMS data feed evidence
- Leak detection specification
- No leak detection
- Sub metering not linked to BMS