ICMM Mining Principles (2024 Update)

Evidence request list. 8 controls, 8 carrying auditor artefact guidance. Generated from the compliance knowledge graph on 11 September 2026. Published by The Art of Service.

ICMM Principle 5 - Health and Safety

ICMM-MP-P5-HealthSafety-CriticalControl-FatalityPrevention-OccupationalHealth
ICMM Mining Principle 5 - Health + Safety + Critical Control Management (CCM) + Fatality Prevention + Occupational Health + Labour + Diversity

Principle 5 Pursue continual improvement in health and safety performance with the ultimate goal of zero harm. PEs 5.1-5.6: implement OHS management system aligned with ISO 45001 + national OHS legislation + ICMM Critical Control Management (CCM) framework focused on prevention of fatalities + serious incidents from major hazards (geotechnical failure + uncontrolled energy release + fire + explosion + vehicle interaction + working at heights + confined space + electricity + chemical exposure + ground control). CCM 5-step approach: identify major unwanted events; identify critical controls; performance specifications + verification; ongoing monitoring + reporting; periodic review + improvement. Fatality Prevention: ICMM Fatality Prevention Tools + Fatality Cause Analysis + Bow-Tie Risk + Learning from Fatalities sharing; integrated with ICMM Safety Data + Transparent Safety Data Reporting

Artefacts an auditor will ask for
  • OHS management system + ISO 45001 certification + national OHS compliance + audit
  • ICMM CCM implementation per major hazard + 5-step + critical controls + verification + monitoring
  • Fatality prevention tools + cause analysis + Bow-Tie + TRIFR + LTIFR + FFR + benchmarking
  • Occupational health surveillance + biological monitoring + medical examinations + sectoral disease prevention
  • DEI policy + gender equity + women in mining + grievance + non-discrimination + ILO Conventions
Where this commonly fails
  • OHS management system clause-based without critical control focus
  • CCM identified but not verified or monitored
  • Fatality prevention reactive (incident review only, no proactive)
  • Occupational health only at medical exam (no risk assessment or surveillance)
  • DEI policy without measurable progress on gender + indigenous + visible minority

ICMM Principle 8 - Responsible Production

ICMM-MP-P8-ResponsibleProduction-MaterialsStewardship-Mercury-ProductLifecycle
ICMM Mining Principle 8 - Responsible Production + Materials Stewardship + Mercury Risk Management + Product Lifecycle + Circular Economy

Principle 8 Facilitate and support the knowledge-base and systems for responsible design + use + re-use + recycling and disposal of products containing metals and minerals. PEs 8.1-8.4: materials stewardship covering product lifecycle (design + production + use + end-of-life); product safety + chemical management (REACH + GHS + national chemicals legislation); responsible sourcing of materials + conflict minerals (3TG + cobalt + nickel + lithium + rare earths + OECD Due Diligence Guidance for Responsible Supply Chains of Minerals from Conflict-Affected and High-Risk Areas) + EU Conflict Minerals Regulation + US Dodd-Frank Section 1502 + LBMA + RJC + RMI Responsible Minerals Initiative; circular economy + re-use + recycling + by-product valorisation + tailings recovery; supply chain transparency + Battery Passport + EU Battery Regulation; product environmental footprint + LCA Life Cycle A

Artefacts an auditor will ask for
  • Materials stewardship policy + product lifecycle assessment + LCA + Battery Passport for batteries
  • Conflict minerals OECD Due Diligence + 3TG + cobalt + EU/US regulatory compliance + RMI
  • Circular economy projects + tailings recovery + by-product valorisation + recycled content
  • Mercury Minamata Convention compliance + ASGM engagement + mercury-free processing
  • Critical minerals supply chain + ICSV + responsible sourcing for energy transition (Li + Ni + Co + REE)
Where this commonly fails
  • Materials stewardship limited to product safety (no full lifecycle)
  • Conflict minerals only tier-1 (no upstream tier 2/3 visibility)
  • Circular economy aspirational without operational projects
  • Mercury Convention compliance gaps in ASGM partnerships
  • Critical minerals without responsible sourcing pre-conditions

ICMM Principles 1-2 - Governance

ICMM-MP-P1-P2-Governance-EthicalBusiness-DecisionMaking-Sustainability
ICMM Mining Principles 1 + 2 - Ethical Business + Decision Making + Sustainability Integration into Governance

Principle 1 Ethical Business: apply ethical business practices and sound systems of corporate governance and transparency to support sustainable development. Performance Expectations (PEs) 1.1-1.4: implement and maintain ethical business practices including: anti-corruption (compliance with UN Convention Against Corruption + OECD Convention + national anti-bribery laws + FCPA + UK Bribery Act); revenue transparency (EITI Extractive Industries Transparency Initiative); responsible political engagement and lobbying disclosure; ethical decision-making policy; whistleblowing mechanism + protection; due diligence on agents + joint venture partners + suppliers; conflict of interest management. Principle 2 Decision Making: integrate sustainable development considerations within the corporate decision-making process. PEs 2.1-2.4: integrate sustainable development into corporate strategy + busine

Artefacts an auditor will ask for
  • Code of ethics + anti-corruption policy + ISO 37001 alignment + FCPA/UKBA compliance evidence
  • EITI participation + revenue disclosure + responsible political engagement register
  • Sustainability strategy + business plan integration + project lifecycle decision-making
  • Board ESG committee + charter + meeting minutes + KPI oversight
  • Senior management remuneration linked to sustainability KPIs + science-based targets (SBTi + TNFD)
Where this commonly fails
  • Code of ethics generic without training or enforcement
  • EITI participation not extended to all jurisdictions
  • Sustainability strategy siloed from business strategy
  • Board ESG oversight nominal (no decision authority)
  • Remuneration KPIs financial-only (no sustainability)

ICMM Principles 3-4 - Human Rights + Risk

ICMM-MP-P3-P4-HumanRights-RiskMgmt-UNGP-DueDiligence
ICMM Mining Principles 3 + 4 - Human Rights (UNGPs Alignment) + Risk Management + Due Diligence

Principle 3 Human Rights: respect human rights and the interests + cultures + customs + values of employees and communities affected by our activities. PEs 3.1-3.6 aligned with UN Guiding Principles on Business and Human Rights (UNGPs) Pillars 2 + 3: respect human rights policy + governance commitment + senior accountability; human rights due diligence (HRDD) covering identification + assessment + integration + tracking + communicating + remediation; specific risk areas (security personnel + Voluntary Principles on Security and Human Rights + resettlement + indigenous peoples + Free Prior and Informed Consent FPIC per UN Declaration on the Rights of Indigenous Peoples UNDRIP + child labour + forced labour + modern slavery + freedom of association + gender equity + women in mining); operational-level grievance mechanism (OLGM) effectiveness criteria + UNGP Principle 31 + access to remedy.

Artefacts an auditor will ask for
  • Human rights policy + UNGP commitment + senior accountability + training
  • HRDD assessment + identification + integration + tracking + communicating + remediation per site
  • Operational-level grievance mechanism + UNGP Principle 31 + access to remedy + cases
  • Risk management framework per ISO 31000 + risk register + treatment + monitoring per site
  • Critical risk management + catastrophic event scenarios (tailings + collapse + spill) + tabletop
Where this commonly fails
  • Human rights policy without HRDD operationalisation
  • OLGM not effective (UNGP Principle 31 criteria not met)
  • Risk management without critical risk identification + catastrophic event scenarios
  • FPIC not applied to indigenous-affected projects (UNDRIP gap)
  • Modern slavery due diligence missing for tier 2/3 suppliers

ICMM Principles 6-7 - Environment + Biodiversity

ICMM-MP-P6-P7-Environment-Biodiversity-Climate-Closure-Water-Tailings
ICMM Mining Principles 6 + 7 - Environmental Performance + Biodiversity + Climate + Mine Closure + Water Stewardship + Tailings (GISTM)

Principle 6 Pursue continual improvement in environmental performance issues, such as water stewardship + energy use + climate change. PEs 6.1-6.7: environmental management system aligned with ISO 14001 + national environmental legislation; impact assessment + management + monitoring + reporting + closure planning. Climate Change (PS-Climate + 2024 Climate Change Policy): net-zero by 2050 commitment + Science-Based Targets (SBTi) + Scope 1 + 2 + 3 emissions + decarbonisation roadmap; TCFD aligned disclosure + 2024 transition plan; Scope 1 + 2 absolute reduction + Scope 3 supplier engagement + product use (downstream + smelting + steel); just transition. Water Stewardship (PS-Water): water management + watershed approach + alignment with UN Water Action Decade; water risk assessment + WRI Aqueduct + WBCSD water tools; water disclosure CDP Water + GRI 303; water-related grievance with comm

Artefacts an auditor will ask for
  • EMS + ISO 14001 + national environmental compliance + impact assessment + monitoring + closure
  • Net-zero 2050 commitment + SBTi + Scope 1+2+3 + TCFD transition plan + just transition
  • Water stewardship + watershed approach + WRI Aqueduct + CDP Water + community water access
  • Biodiversity mitigation hierarchy + IUCN protected areas + CBD Kunming-Montreal + species action plan
  • GISTM implementation per facility + 77 requirements + risk classification + ITRB + EoR + RTFE + EPP
Where this commonly fails
  • EMS clause-based without continual improvement
  • Net-zero commitment without SBTi-verified pathway or Scope 3 inclusion
  • Water management without watershed approach or community access
  • Biodiversity assessment without no net loss commitment
  • GISTM partial implementation (deadlines missed for Very High/Extreme facilities)

ICMM Principles 9-10 - Social Performance + Stakeholders

ICMM-MP-P9-P10-SocialPerformance-Indigenous-Conflict-Stakeholder-Community
ICMM Mining Principles 9 + 10 - Social Performance + Community + Indigenous Peoples + Conflict-Affected Areas + Stakeholder Engagement + Disclosure

Principle 9 Pursue continual improvement in social performance and contribute to the social, economic and institutional development of host countries and communities. PEs 9.1-9.6: social performance management + community development + local economic development; resettlement (when avoidable) per IFC Performance Standard 5 + ICMM PS-Resettlement + just compensation + livelihood restoration; cultural heritage protection + Burra Charter + ICOMOS; local content + procurement + employment; community grievance mechanism + accessibility + transparency + UNGP Principle 31. Indigenous Peoples (PS-Indigenous + UNDRIP alignment): Free Prior and Informed Consent (FPIC) + Impact Benefit Agreements (IBAs) + cultural heritage protection + traditional knowledge respect + indigenous land rights; ILO Convention 169. Conflict-Affected and High-Risk Areas (PS-Conflict): heightened due diligence + OECD Due

Artefacts an auditor will ask for
  • Community development + resettlement IFC PS 5 + livelihood restoration + cultural heritage protection
  • Indigenous engagement + FPIC + IBAs + UNDRIP + ILO 169 + traditional knowledge respect
  • Conflict-affected heightened due diligence + Voluntary Principles + security personnel training
  • Stakeholder engagement framework + AA1000 + accessibility + transparency + grievance + community feedback
  • Sustainability disclosure + GRI 14 Mining 2024 + IFRS S1/S2 + SASB + ISSB + EFRAG ESRS + AA1000AS assurance
Where this commonly fails
  • Community development without livelihood restoration metrics
  • FPIC consultation only (not consent in good faith)
  • Conflict-affected operations without elevated due diligence
  • Stakeholder engagement annual townhall only (no continuous + accessible mechanism)
  • Sustainability disclosure unverified (no AA1000AS assurance)

ICMM Scope + Mining Principles Overview

ICMM-MP-Scope-10Principles-PerformanceExpectations-2024Update-Members
ICMM Mining Principles - Scope + 10 Principles + 8 Position Statements + Performance Expectations (PEs) + 2024 Update + Members

International Council on Mining and Metals (ICMM) Mining Principles - voluntary sustainability framework for the global mining and metals industry. ICMM established 2001, headquartered London. 24 member companies (BHP + Rio Tinto + Glencore + Anglo American + Vale + Newmont + Barrick + Teck + Antofagasta + AngloGold Ashanti + Mitsubishi Materials + Codelco + Freeport-McMoRan + Sumitomo Metal Mining + South32 + Polyus + Nornickel + JX Nippon + Boliden + Sibanye-Stillwater + Yamana + others) representing approximately 30 percent of global metals and mining production. ICMM 10 Mining Principles: 1 Ethical Business + 2 Decision Making + 3 Human Rights + 4 Risk Management + 5 Health and Safety + 6 Environmental Performance + 7 Conservation of Biodiversity + 8 Responsible Production + 9 Social Performance + 10 Stakeholder Engagement. Each Principle is supported by detailed Performance Expectat

Artefacts an auditor will ask for
  • ICMM membership status + commitment to 10 Principles + PEs + position statements
  • 10 Mining Principles implementation matrix + corporate and operational levels
  • 38 Performance Expectations coverage + gap analysis + remediation plan
  • 8 Position Statements adoption + implementation evidence + reporting
  • 2024 Update integration with CMSI (Consolidated Mining Standard Initiative) + TSM + Copper Mark + WGC RGMP
Where this commonly fails
  • ICMM membership commitment paper-only (no operational implementation)
  • Performance Expectations coverage incomplete (gaps not remediated)
  • Position Statements adopted but not operationalised
  • 2024 Update not integrated into existing management system
  • CMSI integration ignored despite consolidation direction

ICMM Validation + Assurance + Coordination

ICMM-MP-Validation-Assurance-Disclosure-Coord-CMSI-TSM-IRMA-OECD-UNGC
ICMM Mining Principles - Site-Level Validation + Assurance + Transparent Disclosure + Coordination CMSI + TSM + IRMA + OECD MNE + UN Global Compact + IFC PS

ICMM member assurance framework covers: corporate-level commitment + site-level Validation + Assurance + Transparent Disclosure. Site-level Validation: every operating site validated against ICMM Performance Expectations (PEs) every 3 years by independent third-party assurer (approved by ICMM); validation report covers PE-by-PE conformance + gap remediation + improvement actions; risk-based scope + materiality + sampling. Corporate Assurance: annual sustainability report assured per AA1000AS + ISAE 3000/3410; corporate sustainability disclosure aligned with GRI Standards (including GRI 14 Mining Sector 2024) + IFRS Sustainability Disclosure Standards (S1 General + S2 Climate) + SASB Materials/Metals + ISSB + EFRAG ESRS for EU CSRD; ESG ratings (S&P + MSCI + Sustainalytics + Refinitiv). Transparent Disclosure: annual public reporting + materiality determination + stakeholder input + clima

Artefacts an auditor will ask for
  • Site-level Validation reports per operating site + 3-year cycle + PE-by-PE conformance + remediation
  • Corporate sustainability report assurance + AA1000AS / ISAE 3000 + scope + materiality + opinion
  • Sustainability disclosure + GRI 14 Mining 2024 + IFRS S1/S2 + SASB + ISSB + EFRAG ESRS for EU CSRD
  • CMSI convergence + equivalency matrix + TSM + Copper Mark + WGC RGMP + IRMA single-standard readiness
  • Coordination matrix + OECD MNE + UN GC + IFC PS + Equator Principles + UN SDGs + ETC + CRIRSCO + GTMI
Where this commonly fails
  • Site-level Validation delayed beyond 3 years
  • Corporate assurance limited scope (no AA1000AS principles-level)
  • Disclosure stuck on GRI only (no IFRS S1/S2 or ESRS for CSRD reach)
  • CMSI convergence ignored despite 2024 announcement
  • Standalone ICMM only without IRMA or TSM equivalency
Assembled from the framework's own control set. Every line traces to a control in the graph, so this pack is regenerated rather than written, and stays current as the graph does.

Assembled from the framework’s own control set, so this list is regenerated rather than written and stays current as the graph does. See the ICMM Mining Principles (2024 Update) framework page.