UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Evidence request list. 26 controls, 26 carrying auditor artefact guidance. Generated from the compliance knowledge graph on 12 September 2026. Published by The Art of Service.

CPP

UKCDM-3
Construction Phase Plan and Site Safety

Per UK Construction (Design and Management) Regulations 2015 (CDM 2015): Construction Phase Plan and Site Safety. Source-grounded summary control covering authoritative framework structure + key obligations. See manifest + log for detailed mapping.

Artefacts an auditor will ask for
  • Authoritative source-grounded evidence for UKCDM-3
Where this commonly fails
  • see authoritative source for detailed gap analysis

Construction Phase Plan and Health and Safety File

CDM-R12
Construction Phase Plan

Before construction starts, the Principal Contractor (or sole contractor on single-contractor projects) must prepare a construction phase plan describing how health and safety will be managed.

Artefacts an auditor will ask for
  • Construction phase plan signed off prior to mobilisation
  • Plan version history showing updates as work evolves
  • Site rules and induction pack
  • Welfare facilities plan
  • Emergency arrangements section
  • Distribution list confirming plan shared with subcontractors
Where this commonly fails
  • Plan generic and not project-specific
  • Plan not updated through project
  • Subcontractors not given the plan
CDM-R12-H
Health and Safety File

The Principal Designer must prepare a health and safety file containing information for the safe future use, maintenance and demolition of the structure, handing it to the client at project completion.

Artefacts an auditor will ask for
  • Health and safety file index aligned to L153 Appendix 4
  • As-built drawings and BIM model with H&S attributes
  • Asbestos register where applicable
  • Operation and maintenance manuals
  • Hazardous materials inventory
  • Client receipt of handover file
Where this commonly fails
  • File issued without asbestos register
  • As-built drawings missing
  • Client receipt unsigned

Design Change and Enforcement

CDM-DESIGNCHG
Managing Design Change During Construction

Design changes made after the construction phase begins must be assessed for health and safety impact, with the Principal Designer or designer updating residual risk information and informing duty holders.

Artefacts an auditor will ask for
  • Design change request log
  • Health and safety impact assessment per change
  • Residual risk register updates
  • Construction phase plan update record
  • Designer sign-off on each change
  • Communication record to site teams
Where this commonly fails
  • Change log not linked to H&S impact
  • Residual risk register out of date
  • Site teams not informed
CDM-ENF
Incident Reporting and Enforcement Liaison

Reportable injuries, dangerous occurrences and ill health must be reported to the HSE under RIDDOR and managed alongside CDM duty holder obligations.

Artefacts an auditor will ask for
  • RIDDOR submission records
  • Site incident investigation reports
  • Near miss and observation log
  • HSE inspection visit records
  • Improvement and prohibition notice register
  • Root cause analysis training records
Where this commonly fails
  • RIDDOR thresholds not understood
  • Near misses unrecorded
  • Root cause analysis skipped

Duty Holder Roles and Appointments

CDM-DOMESTIC
Domestic Client Projects

Where the client is a domestic client, client duties pass by default to the contractor on single-contractor projects or to the Principal Contractor on multi-contractor projects, unless a written agreement transfers them to the Principal Designer.

Artefacts an auditor will ask for
  • Domestic client status assessment
  • Written agreement assigning client duties to Principal Designer
  • Standard domestic CDM information leaflet issued to client
  • Single contractor scope and CPP
  • F10 if applicable to domestic project
  • Project file evidencing duty transfer
Where this commonly fails
  • Duty transfer not documented
  • Client unaware of residual duties
  • No information leaflet issued
CDM-R11
Principal Designer Duties (Regulation 11)

The Principal Designer must plan, manage, monitor and coordinate health and safety during the pre-construction phase and prepare the pre-construction information.

Artefacts an auditor will ask for
  • Pre-construction information pack
  • Design coordination meeting minutes
  • Hazard identification workshops records
  • Pre-construction phase plan
  • Designer compliance audit records
  • Handover record to Principal Contractor
Where this commonly fails
  • PCI not issued before tender
  • No documented design coordination
  • Handover to Principal Contractor verbal only
CDM-R13
Principal Contractor Duties (Regulation 13)

The Principal Contractor must plan, manage, monitor and coordinate health and safety during the construction phase, including liaison with the client and site management.

Artefacts an auditor will ask for
  • Site management organogram
  • Weekly site coordination meeting minutes
  • Permit-to-work registers
  • Daily site inspection records
  • Toolbox talks register
  • Liaison records with the client
Where this commonly fails
  • Permit-to-work system absent
  • Site inductions not refreshed
  • Coordination meetings not minuted
CDM-R4
Client Duties (Regulation 4)

Clients must make suitable arrangements for managing a project, ensuring sufficient time and resource for health and safety, and confirming duty holders are appointed in writing.

Artefacts an auditor will ask for
  • Written appointment letters for Principal Designer and Principal Contractor
  • Project management arrangements statement
  • Time and resource allocation evidence in project programme
  • Client CDM responsibilities briefing record
  • Pre-construction information pack issued to designers and contractors
  • Client review meeting minutes referencing CDM duties
Where this commonly fails
  • Verbal appointments only
  • Pre-construction information incomplete
  • Client unaware of personal duties
CDM-R5
Appointment of Principal Designer and Principal Contractor

On projects with more than one contractor, the client must appoint in writing a Principal Designer for the pre-construction phase and a Principal Contractor for the construction phase.

Artefacts an auditor will ask for
  • Signed Principal Designer appointment letter dated before design starts
  • Signed Principal Contractor appointment letter dated before construction starts
  • Competence assessment records for each duty holder
  • Scope of services schedule for each appointment
  • Variation records where appointments change mid-project
  • Client checklist confirming appointment timing
Where this commonly fails
  • Principal Designer appointed after design started
  • Principal Contractor appointed only at site mobilisation
  • No competence assessment
CDM-R6
F10 Notification to HSE

Projects lasting longer than 30 working days with more than 20 workers simultaneously, or exceeding 500 person-days, must be notified to the HSE using the F10 form.

Artefacts an auditor will ask for
  • Submitted F10 form with HSE acknowledgement
  • F10 notification displayed at site entrance
  • Threshold assessment showing why project is or is not notifiable
  • F10 update submissions where duty holders change
  • F10 record retained in project file
  • Communication to duty holders confirming notification reference
Where this commonly fails
  • F10 not displayed on site
  • Notification submitted late
  • Updates not filed when duty holders change
CDM-R8
General Duties (Designers and Contractors)

All duty holders must have the necessary skills, knowledge, experience and organisational capability to fulfil their roles, and must cooperate with others involved in the project.

Artefacts an auditor will ask for
  • SKEC (skills, knowledge, experience, capability) assessment records
  • CSCS or equivalent card register for site workers
  • Designer chartered status evidence
  • Subcontractor pre-qualification questionnaires
  • Cooperation protocol between duty holders
  • Project induction records covering interfaces between trades
Where this commonly fails
  • PQQ pack out of date
  • No SKEC evidence for individual designers
  • Cooperation undocumented
CDM-R9
Designer Duties (Regulation 9)

Designers must eliminate foreseeable risks where possible, reduce or control risks that remain, and provide information about residual risks to those who need it.

Artefacts an auditor will ask for
  • Designer risk register with ERIC or general principles of prevention applied
  • Design risk assessment outputs referenced in drawings
  • Residual risk register issued with design package
  • BIM model with health and safety attributes
  • Designer CPD records covering CDM
  • Design review minutes addressing residual risk
Where this commonly fails
  • Risk reduction not evidenced in design choice
  • Residual risks omitted from drawings
  • Designer CPD on CDM out of date

Engagement

UKCDM-4
Worker Engagement, Training, Monitoring

Per UK Construction (Design and Management) Regulations 2015 (CDM 2015): Worker Engagement, Training, Monitoring. Source-grounded summary control covering authoritative framework structure + key obligations. See manifest + log for detailed mapping.

Artefacts an auditor will ask for
  • Authoritative source-grounded evidence for UKCDM-4
Where this commonly fails
  • see authoritative source for detailed gap analysis

Information, Training and Worker Engagement

CDM-R14
Site Induction, Information and Training

The Principal Contractor must ensure every worker receives a suitable site induction and the information and training needed to carry out their work safely.

Artefacts an auditor will ask for
  • Induction attendance register with signatures
  • Induction content covering site-specific hazards
  • Refresher induction trigger criteria
  • Training matrix for site roles
  • Visitor briefing records
  • Site rules acknowledgement forms
Where this commonly fails
  • Induction not site-specific
  • Visitors not briefed
  • Training matrix incomplete
CDM-R15
Consultation and Engagement with Workers

Contractors must consult workers on matters affecting their health and safety and provide arrangements for engagement throughout the project.

Artefacts an auditor will ask for
  • Worker safety committee terms of reference
  • Toolbox talk attendance and feedback log
  • Worker representative election records
  • Safety suggestion scheme entries
  • Stop work authority policy
  • Engagement survey results
Where this commonly fails
  • No worker representative
  • Toolbox talks one-way only
  • Stop work authority not communicated

Notification

UKCDM-2
Risk Assessment, Pre-Construction Information, F10

Per UK Construction (Design and Management) Regulations 2015 (CDM 2015): Risk Assessment, Pre-Construction Information, F10. Source-grounded summary control covering authoritative framework structure + key obligations. See manifest + log for detailed mapping.

Artefacts an auditor will ask for
  • Authoritative source-grounded evidence for UKCDM-2
Where this commonly fails
  • see authoritative source for detailed gap analysis

Part 4 General Requirements for Construction Sites

CDM-DUST
Construction Dust and Occupational Health

Construction dust including silica, wood and other hazardous substances must be assessed, controlled and monitored to protect long-term worker health.

Artefacts an auditor will ask for
  • COSHH assessment register for dust and chemicals
  • On-tool extraction records and LEV examination certificates
  • Health surveillance programme records
  • Face fit testing records for RPE
  • Air monitoring results
  • Silica exposure register
Where this commonly fails
  • On-tool extraction not used
  • No face fit testing
  • Health surveillance absent
CDM-HEIGHT
Working at Height

Work at height must be properly planned, supervised and carried out using equipment that minimises the risk of falls and falling objects.

Artefacts an auditor will ask for
  • Working at height risk assessments and method statements
  • Scaffold design and handover certificates
  • MEWP operator (IPAF) cards
  • Harness inspection records
  • Fall arrest rescue plan
  • Edge protection inspection log
Where this commonly fails
  • No rescue plan from height
  • Harnesses uninspected
  • Scaffold handover missing
CDM-R17
Welfare Facilities (Schedule 2)

Suitable welfare facilities including sanitary conveniences, washing facilities, drinking water, rest areas and changing facilities must be provided from the start of the construction phase.

Artefacts an auditor will ask for
  • Welfare facilities specification before mobilisation
  • Photographic evidence of welfare provision on site
  • Cleaning and servicing schedule
  • Female workforce provision evidence
  • Drinking water supply test records
  • First aid facility register
Where this commonly fails
  • Insufficient toilets for workforce size
  • No separate facilities for female workers
  • Water supply untested
CDM-R19
Workplace Safety on Construction Sites

Construction sites must be organised to provide safe access and egress, prevent unauthorised entry, and control hazards such as traffic, falling objects, and openings.

Artefacts an auditor will ask for
  • Site logistics plan showing access routes and segregation
  • Hoarding and signage inspection records
  • Traffic management plan
  • Edge protection inspection schedule
  • Daily site walk inspection record
  • Access control system logs
Where this commonly fails
  • Pedestrian and vehicle routes not segregated
  • Edge protection not inspected weekly
  • Hoarding gaps allowing unauthorised access
CDM-R22
Stability of Structures and Excavations

Temporary and permanent structures, excavations, cofferdams and caissons must be designed, constructed, maintained and inspected to remain stable during the works.

Artefacts an auditor will ask for
  • Temporary works register with designer and coordinator
  • Temporary works design check certificates
  • Excavation inspection records (daily, weekly, after events)
  • Cofferdam and caisson design statements
  • Permit-to-load and permit-to-dig records
  • Ground investigation report
Where this commonly fails
  • No temporary works coordinator
  • Excavation inspections not signed
  • Ground investigation outdated
CDM-R24
Reports of Inspection

A competent person must inspect specified workplaces at defined intervals and prepare written reports identifying any defects or risks requiring action.

Artefacts an auditor will ask for
  • Statutory inspection register (scaffolds, excavations, lifting)
  • Inspector competence records
  • Defect close-out tracker
  • Inspection report templates aligned to Schedule 3
  • Scaffold handover certificates
  • LOLER inspection certificates for lifting equipment
Where this commonly fails
  • Inspection reports unsigned
  • Defects logged but not closed
  • Inspector competence not evidenced
CDM-R26
Energy Distribution and Services on Site

Electricity, gas, water and other services on site must be installed, maintained and located so they do not endanger workers, with overhead and underground services identified before work.

Artefacts an auditor will ask for
  • Service location survey before works
  • CAT and Genny scanner certification
  • Permit-to-break-ground records
  • Temporary electricity certification (110V CTE)
  • Lockout tagout register
  • Overhead line risk assessment
Where this commonly fails
  • No service survey before excavation
  • Temporary electrics not 110V CTE
  • Permit-to-break-ground missing
CDM-R29
Emergency Procedures and Routes

Suitable emergency procedures, routes, exits and means of warning must be provided and rehearsed to deal with foreseeable emergencies on construction sites.

Artefacts an auditor will ask for
  • Site emergency plan
  • Fire risk assessment for construction site
  • Emergency drill records
  • Muster point signage layout
  • Fire warden roster
  • Liaison records with emergency services
Where this commonly fails
  • No drills conducted
  • Fire risk assessment not updated as works progressed
  • Muster points not displayed

Roles

UKCDM-1
Client, Principal Designer, Principal Contractor Duties

Per UK Construction (Design and Management) Regulations 2015 (CDM 2015): Client, Principal Designer, Principal Contractor Duties. Source-grounded summary control covering authoritative framework structure + key obligations. See manifest + log for detailed mapping.

Artefacts an auditor will ask for
  • Authoritative source-grounded evidence for UKCDM-1
Where this commonly fails
  • see authoritative source for detailed gap analysis
Assembled from the framework's own control set. Every line traces to a control in the graph, so this pack is regenerated rather than written, and stays current as the graph does.

Assembled from the framework’s own control set, so this list is regenerated rather than written and stays current as the graph does.